Tomatin Modular WTW Ready for Workshop Commissioning

RSE were engaged by ESD (Efficient Service Delivery) to provide a completely new water treatment works to replace an existing dosing system to achieve compliance of DW25 driver for cryptosporidium as the existing chemical dosing assets were nearing the end of their life expectancy.

Aerial Image of Tomatin Modular WTW in the factory.

Tomatin Modular WTW during manufacture in our Muir of Ord Facility.

RSE were responsible for the design, fabrication, installation and commissioning of the new modular WTW which contains water quality monitoring instrumentation, cartridge filtration system, UV treatment, sodium hypochlorite disinfection, chlorine contact pipe, sodium carbonate pH correction, treated water re-lift pumps, an MCC and welfare facilities.

3D Render - Tomatin Modular WTW

3D Render – Tomatin Modular WTW

Furthermore, RSE were responsible for the civil design and construction of all of the associated infrastructure required for the new WTW as well as the design and construction of a new borehole rising main and new section of treated water rising main to connect the new WTW to the existing rising main.

Main slab area, where the WTW will be located, being prepared before final concrete pour.

Main slab area, where the WTW will be located, being prepared before final concrete pour.

A major challenge of the project involved working directly above a live, single source borehole which required mitigation measures such as excavation depth limits, surface water control, off site welfare facilities, utilisation of food grade oil and the installation of a temporary hydrocarbon monitoring system.

Overview Render - Tomatin Modular WTW

Overview Render – Tomatin Modular WTW

To find out more about similar water treatment plants click on the following link – Municipal Water Treatment

Alternatively visit the contacts page to get in touch – Contacts

Ross-shire Engineering Email Newsletter | Stay Up To Date

Your name
Your email address

By signing up for our Email Newsletter we would like to send you a monthly update regarding Ross-shire Engineering news. You can unsubscribe at any time. Please read our Privacy Policy for further details.